Name | Client | Duration | Project Description |
Seac Pai Van CN6b Public Housing Project | Gabinete para o Desenvolvimento de Infra-estruturas | 2014 - 2016 |
E&M installation work, plumbing and drainage works |
Empreendimento da Habita??o Pública na Estrada Nordeste da Taipa | Macau SAR Government | 2014 - 2016 |
ELV electrical installation |
Empreitada das novas instala??es do tribunais de base | Macau SAR Government | 2014 - 2016 |
Air conditioning, ventilation, P&D works |
Lisboa Palace P&D Project (DCS3082) | SJM Holdings Limited | 2015 - 2017 |
P&D Works |
Lisboa Palace E&M Works at Podium (DSC3060, DSC3061-1, DSC3061-2) | SJM Holdings Limited | 2015 - 2017 |
E&M installation works |
VIP building of the Macau Airport | Macau International Airport | 2012 |
Borehole surveying, design and general contracting (Foundation, main structure, fa?ade, lift, fans and air conditioning, fire prevention works, P&D, E&M works, fitting out works, greening, etc.) |
Minghai Ya Yuan | SJM Holdings Limited | 2013 - 2015 |
Main structure, fitting out ,HAVC, E&M services, plumbing and drainage ,fire prevention |
Lisboa Palace DSC 1014-4 | SJM Holdings Limited | 2015 - 2017 |
Main structure,brickwork, plastering, woodwork and fire rated steel doors |